Market Watch · The Docket: Statesboro and Metter
Statesboro and Metter: what was filed, approved, and started in October 2026
October 2026 · as last updated October 27
This is the October report as it stood when November began. It is frozen: later corrections are noted at the top of this page, and the current report is on the market page.
Where the I-16 market is growing.
Bulloch County had 86,949 people and 36,248 housing units in 2025, up 9.2 percent in population since 2020. Candler County had 11,275 people, up 2.5 percent.1 Since April 2025, councils and commissions here have approved about 1,700 homes and apartments with published counts, across six projects: Old Register Road (1,173), Herman Rushing Road (198), the Hunnicutt subdivision (134), the Coca-Cola site (108), Maria Sorrell Road (66), and East Olliff Street (19).2422 That is about 5 percent of Bulloch's housing, or a little over a year of construction at 2025's pace of 1,389 permits.1 Add the other units the city counts in its southeast corridor and Brooklet's 300-acre annexation, and the pipeline is about 3,300 units: nearly a tenth of the county's housing.67 Approved is not built.
Industrial parks, innovation facilities and development land
Added October 27, 2026. This is a first inventory of parks, public development assets and related land opportunities. Public involvement can mean ownership, a development-authority role, a university partnership or an infrastructure investment. It does not mean that every parcel is publicly owned or available. Park profiles and early leads are separate from the construction table and its totals.
Where to look. Gateway and Cannady lie south of Statesboro, while Bruce Yawn is the distinct I-16 / US 301 park formerly called Southern Gateway. Airport Industrial Park is north of town. Perimeter Center and Ogeechee Tech's training facility are another part of the industrial ecosystem. Downtown Statesboro and Metter have incubator facilities rather than large industrial land offerings. Metter's industrial park has announced manufacturing and agribusiness projects, with a separate expansion proposal to follow.
The new public asset is already open. Ogeechee Tech reports that training began October 5 and the Georgia Training Center for Industrial Operations opened October 15. It is about 40,000 square feet and a $27 million investment, with land contributed by the development authority. It belongs in the public-development layer as an operating facility, not active construction. College announcement.
Purple markers show seven supported park or facility locations. The nine descriptions below also retain Bruce Yawn and Perimeter Center while their map anchors are checked. Markers are context locations; they do not outline the parks or identify all available lots.
| Park / site | Public role | What is there / going in | Available / next check |
|---|---|---|---|
| Gateway Regional Industrial Park Gateway Boulevard / AJ Riggs Road, Bulloch County Established industrial district | Development-authority industrial district; ownership and commitments vary by parcel. | Existing: Authority identifies Walmart at Gateway without specifying Phase I or II. Gateway II tenants are described separately below. Incoming: revalyu's recycling facility is tracked separately; its current operating status remains unconfirmed. | No park-wide vacant-land balance established. Occupied or committed parcels are not available public inventory. Authority park inventory · EPD revalyu address |
| Gateway II / Cannady Site JC Cannady Road off US 301 South, Bulloch County Approximately 70 acres marketed | DABC-led site preparation and recruitment; current parcel title and reservations need confirmation. | Existing: DABC names Great Dane and WL Plastics in the park and revalyu as a planned facility. Incoming: June 2025 grant supports grading and sewer work; completion of the pad-ready work has not been verified. | State-hosted listing updated January 14, 2026 offers 69.70 acres for sale or lease, while its total-acre field says 121.80. Treat these as unreconciled offering/parent figures, not additive supply. Price unit unconfirmed. State-hosted offering · DABC grant announcement |
| Bruce Yawn Commerce Park I-16 / US 301 interchange, Bulloch County Also called Southern Gateway Commerce Park | Authority-sponsored park with committed private industrial projects; no current vacant balance established. | Existing: AJIN Georgia opened in July 2024. Southern Gateway is the former name of this park, not another park. Incoming: Former Aspen project reuse and nearby Northpoint warehouse plans need current parcel reconciliation. | Older marketing acreage is not reliable current availability. Current ownership, commitments and remaining land need checking. Described here without an unverified map pin. State park-name record · AJIN opening, contractor |
| Airport Industrial Park US 301 North / Statesboro–Bulloch County Airport 20–175 acres in a dated offering | Authority-promoted industrial location; current individual titles and airport lease restrictions need checking. | Existing: Industrial location beside the public airport. Incoming: Airport hangar leases, land disposal and utility works are separate leads below; no new industrial tenant confirmed here. | State-hosted listing updated August 12, 2025 advertises 20–175 acres. Confirm present availability and infrastructure before relying on it; this is not a current vacancy certification. State-hosted offering · Authority park inventory |
| Perimeter Center Park US 301 South beside Ogeechee Technical College, Statesboro Office and light-industrial park | Authority-promoted business park; park-wide public fee ownership not established. | Existing: Smaller commercial tenants in an established office-park setting. Incoming: The new Georgia Training Center for Industrial Operations nearby is described separately; it is a public facility, not vacant park land. | No current available-lot or suite inventory established. Park boundary and map anchor remain unconfirmed; retained here for coverage. Authority description |
| Georgia Training Center for Industrial Operations 66 AJ Riggs Road, Statesboro 39,700 SF; approximately $27 million; OPEN | Ogeechee Tech / TCSG public facility. DABC contributed land; county contributed access-road funding. | Existing: Training began October 5 and the grand opening was October 15, 2026. Labs support industrial systems, automation and robotics. Incoming: An operating workforce asset for regional manufacturers, not an active-construction project. | College offers training and employer programs; no vacant development-land offering implied. Facility page gives 39,700 SF; opening release rounds to 40,000. College opening announcement · Facility and address |
| Statesboro City Campus / Business Innovation Group 58 East Main Street and adjoining City Campus buildings, Statesboro Downtown incubator and innovation facilities | City / downtown-authority / Georgia Southern partnership; current building-by-building title and allocation not fully reviewed. | Existing: Business incubation, fabrication and business-assistance programs, with meeting facilities. Incoming: Current expansion or construction phase not established in this pass. | University offers meeting-space rental subject to scheduling. Incubator vacancies and lease terms require confirmation; this is not a vacant land sale. University BIG programs · Space rental |
| Metter–Candler I-16 Industrial Park West Lytell Street / GA 121, Metter 130+ acres advertised; remaining supply unverified | Candler County Industrial Authority markets the park; public or bond-lease title does not make occupied land available. | Existing: DAS and Doowon announced manufacturing projects here. 4 Fungi's Regenerative held a greenhouse groundbreaking in November 2023; current operations and phases need checking. Incoming: Certification/expansion grant and a separate 24.97-acre Fortner Road addition are being tracked. The latter's final outcome is unverified. | Undated authority page advertises 130+ acres, not a reconciled vacant balance after tenant commitments. Old conceptual parcel/building plans are not current offers. Ask the authority for remaining lots and terms. Authority inventory · County-posted park tenant agreement · 4 Fungi groundbreaking · Fortner notice |
| Georgia Grown Innovation Center 25 South Terrell Street, Metter Agribusiness incubator / innovation facility | Created by City of Metter with Georgia Grown and Georgia Southern partners; current deed and operating lease not reviewed. | Existing: Small agribusiness support, consulting, networking and meeting facilities. Incoming: No new construction phase confirmed; tenant businesses' own expansions are separate projects. | Membership and scheduled meeting-space services are offered. Current incubator-space vacancy and terms require confirmation; not an industrial land offering. Center partnership and services · University space and address |
Metter data centers: two proposals, different jurisdictions
The city's August 21 notice said no developer had approached it about a data center inside city limits. WTOC subsequently reported September 15 that two separate groups were exploring sites: one inside Metter west of US 129 off East Hiawatha Street, and another near the airport in unincorporated Candler County. Mayor Rashida Taylor said the city had not received a formal application as of that report. The city also sought data-center task-force participants. Current city filings and task-force outcomes remain unverified; the September statement should not be read as a current application search.
For the airport area, DatacenterDynamics reported October 12 a Canoochee River RV Resort LLC proposal on about 470 acres at 2700 Airport Road: five buildings of up to 250,000 square feet each, a PUD request and DRI 4846. The same report says Candler commissioners unanimously rejected a moratorium earlier in October. That vote does not approve the development. The airport group may correspond to this filing; the relationship to the city's 100-megawatt Back in Black study is not established. These descriptions are not added together as three committed campuses.
Other projects and land leads to follow
These discoveries are new to this report, not necessarily newly announced. Proposed quantities and historical approvals do not establish current construction or available supply. Possible aliases remain linked rather than counted twice.
| Project / opportunity | What is public / still checking | Source |
|---|---|---|
| Fortner Road industrial-park addition | Metter city notice proposes 24.97 acres between West Lytell and West Hiawatha for light-industrial zoning. October 26 planning review outcome is unverified; November 9 council hearing was scheduled. Distinct from the older 46.76-acre annexation. | October 14 city notice |
| Northpoint / Rocky Road warehouses; probable Exit 116 alias | April 2023 reporting describes rezoning about 359.6 acres for ten warehouses, approximately 3.1 million SF. DRI 3862 describes a similar earlier 3.25-million-SF program. Probable aliases, not additive supply; current land control and construction remain unknown. | April 11, 2023 reporting |
| 4 Fungi's Regenerative, Metter industrial park | WTOC reported a November 15, 2023 greenhouse groundbreaking and $27 million investment. Current production and later processing phases remain unconfirmed. An announced park project, not a verified current vacancy or completed phase. | Groundbreaking report |
| YWK supplier site, 8527 GA 119 South | June 2023 reporting describes heavy-industrial rezoning of 21.94 acres for a 200,000-SF parts plant. Operator, current ownership and construction are unresolved. This is outside the authority parks. | Statesboro Herald |
| Warner Tract Industrial / Portman, Bryan–Bulloch boundary | Reported September 2026 warehouse proposal spans both counties. Project-wide figures include about 178 acres and 2 million SF; the county split is unknown. No quantities are assigned to Bulloch totals and no approval or construction start is inferred. | Reported DRI filing |
| Rushing Tract PUD, Elmer Phillips Road / GA 67 | County staff report identifies 39.05 acres and 400 requested townhome/apartment units plus commercial outparcels in 2022. Current approval validity and construction need checking. An unlabeled regional-map number is not evidence of 835 acres; quantities remain excluded from totals. | County staff report, May 2022 |
| Gas Pro Travel Center #108, US 80 / Burkhalter | DRI 4381 describes a 2025 truck-stop proposal with retail, restaurant and fuel facilities. Current permits or opening have not been established. | Regional review record |
| Waterford Subdivision, Brooklet | DRI 4505 describes 728 proposed detached lots on Parker Avenue North. Relationship to earlier Brooklet/Weyerhaeuser coverage needs checking; no extra units are added to totals. | Regional review record |
| Highway 301 Logistics / Foxfield | Historical DRI 3698 describes about 1.3 million SF. A listed parcel overlaps the Flying J record; possible Bruce Yawn project/parcel reuse is unresolved. Do not count it as separate available warehouse supply yet. | Regional review record |
| Statesboro airport: land release | FAA March 2026 notice sought comment on releasing and selling about 1.5 acres for non-aeronautical use. Final release, buyer and deed remain unverified. A disposal request is not a currently open offering. | FAA notice |
| Statesboro airport: hangars and utilities | March 17, 2026 agenda separately names proposed 30-year ground leases with HDM Enterprises and Statesboro Airport JV. Reporting also describes two corporate hangars and water/sewer funding efforts. Executed leases, project overlaps and current works need reconciliation. | City council packet |
| Downtown Statesboro: public redevelopment land | The 2022 city master plan identifies underused land east of the railroad near City Campus and the McTell Trail, some city-owned. Current parcels and a live developer solicitation have not been established. | City master plan |
Coverage remains partial. The October 27 pass combined public authority inventories, dated offerings, college and city sources, airport leads, local reporting and the Coastal Regional Commission map. A completed DRI review does not mean completed construction. Candler belongs to Heart of Georgia Altamaha, so an empty result in the coastal map is not a Candler inventory. Current titles and vacancies, all county minutes, Fortner outcomes and project aliases remain open. None of the park acreages or early concepts above is added to a new aggregate supply total.
Old Register Road becomes a new center
One project is most of the recent approvals. In August 2025 Statesboro annexed 99.53 acres and expanded a planned development on Old Register Road and US 301 South to 237.59 acres. The plan shows about 1,173 units: some 500 apartments, 225 student cottages, 202 townhomes, and 246 houses, with a hotel, offices, a bank, and retail.23 That is about 70 percent of everything approved since April 2025. It sits between the campus and the interchange, which is where the market's two engines meet.
Growth shifts inside the city
The Bulloch County Commission denied at least 165 rural subdivision lots in 2025 and approved about 200.4 In February 2026 it froze all residential rezonings while it writes an impact fee ordinance, and the freeze now runs through December 31.5 Over the same stretch, Statesboro approved about 1,500 units, most through annexation. Growth that would have spread across the county is landing inside the city, where there is water and sewer. Roads are the cost. The city counts about 1,342 units planned in the Burkhalter and Cawana corridor and has about $8.9 million in roundabouts and widening planned there, with the county sharing costs.6
The jobs land at the interchanges
Hyundai's Metaplant, east on I-16 in Bryan County, had hired 4,365 of its promised 8,500 workers by June 2026. Three of its suppliers sit along US 301 South. Two had hired 698 of the 1,086 jobs they promised: Ajin and Joon Georgia 430, Ecoplastic 268.8 The third, Hanon Systems, announced 160 jobs and lists its Statesboro plant among its production sites; it has not published a headcount.23 The county keeps preparing land: a $1.5 million state grant to make a 69-acre site in Gateway Park pad-ready.9 Two question marks sit nearby. The Aspen Aerogels plant at the interchange was abandoned half-built in February 2025.10 The $200 million revalyu recycling plant in Gateway park broke ground in 2023 with phase one due in late 2025; we have found no report on whether it is running.24
Metter: jobs without houses
Two Hyundai suppliers announced 500 jobs at Metter's I-16 industrial park, DAS with 300 and Doowon with 200.1112 Candler County's employers counted 2,289 jobs in 2023, so the announcements would add about a fifth. The county recorded 7 new housing units permitted in 2025.1 If those jobs materialize and housing production stays that low, Metter would likely depend heavily on workers commuting from outside the city. The industrial park is getting a state grant to renew its certification and expand, and the city is weighing a 46-acre annexation at the exit.1314
Data centers, three ways
Statesboro rezoned 26.49 acres on Burkhalter Road for a 230,000-square-foot data center. A fiscal study puts it at $1.2 billion over 10 years with 12 jobs. Residents have sued.1516 Bulloch County kept its moratorium and set up a citizen working group after a ban failed by one vote.17 Metter posted a fiscal study for a 100-megawatt concept with $1.1 billion in real property and 40 jobs. That study is not a commitment to build. Later public reporting identifies separate city and airport-area data-center proposals, described in the October 27 update below.1825 The numbers explain the interest: large tax bases and few jobs. OpenAI's $20 billion campus in Effingham County shows how big the pull can get.19
Retail moves to the edge
Kroger broke ground on a 99,000-square-foot Marketplace on Veterans Memorial Parkway, anchoring a 21-acre center due in fall 2027.20 On Northside Drive, the old Publix and Kmart boxes are filled again with Academy Sports and HomeGoods.21 New space goes where the new rooftops are. Older corridors are being reused, not abandoned.
What we're watching
- Whether the county adopts impact fees and lifts its rezoning freeze after December 31
- The Burkhalter Road lawsuit and the special use permit that has not been filed
- What the Fortner Road annexation in Metter is for
- Whether revalyu and Hanon report hiring
- Whether Blue Fern Village's 1,794 units come back to the council
New this month
September 2026 records. The project list below covers April 2025 through September.
Burkhalter Road data center: lawsuit filed Approved
6539 Burkhalter Road, Statesboro
Eleven residents and Coastal Communities United asked the court to overturn the August 18 rezoning, which passed 3-2 on the mayor's tiebreaking vote.2629 The developer, 4AM Development, has not yet filed for the special use permit the city's data center ordinance requires and says it intends to proceed.2956
Sources 26, 29, 56 · Verified Oct 2, 2026
Bulloch County data center ban fails, 4-3
Unincorporated Bulloch County
On September 1 the commission voted down a text amendment that would have banned data centers in commercial and industrial zones. The chairman broke the tie. The commission created a 21-member citizen working group. The moratorium on data center applications stays in place through December 31, 2026.30
Source 30 · Verified Oct 2, 2026
Zetterower Road rezoning Filed
Zetterower Road, Statesboro
Zack Smith Properties asked to rezone 17.83 acres to R-4, high-density residential, for 192 apartments: independent senior living and multifamily.68 The council tabled the request to November 17 while the developer works out access with GDOT.28 A 198-apartment request on nearly the same site drew a staff recommendation of denial in 2025.
Sources 27, 28, 68 · Verified Oct 2, 2026
Statesboro Summit rehabilitation Approved
Statesboro
The council approved up to $12 million in housing authority bonds to rehabilitate 98 units, with no city debt.28
Source 28 · Verified Oct 2, 2026
Tormenta Way rezoning and a new housing incentive Filed
Tormenta Way, Statesboro; citywide
The September 15 agenda carried a request by Techwood Lodging to rezone 3.8 acres from PUD to mixed use for a 122-room WoodSpring Suites extended-stay hotel.68 It also carried an ordinance replacing the city's subdivision incentive program with a workforce housing incentive program.27 Outcomes will appear in the minutes.
Sources 27, 68 · Verified Oct 2, 2026
Fortner Road annexation Filed
Fortner Road west of Crabby Lane, Metter
Metter held a hearing on September 14 on annexing and rezoning 46.76 acres. A separate notice set highway commercial zoning for 990 Fortner Road.3233 The applicant and the use were not named.
Sources 32, 33 · Verified Oct 2, 2026
Metter publishes a data center study
Metter / Candler County; study-to-project and site match unresolved
The city posted a February 2026 fiscal impact analysis for a 100-megawatt concept called Project Back in Black. Its assumptions include $1.1 billion in real property, $5.5 billion in equipment and 40 jobs.3435 The study does not establish a committed developer, a construction start or a confirmed site. Subsequent city and county proposals are described in the October 27 update below; their relationship to this study remains unresolved.
Sources 34, 35, 36, 72 · Verified Oct 2, 2026
Burkhalter Road corridor study Approved
Burkhalter Road, Bulloch County and Statesboro
The county approved a $193,500 contract with Kimley-Horn for a 2.2-mile corridor study on September 1.31 It follows a February city-county agreement to share the cost of improvements on Burkhalter, Harville, and Cawana roads.54
Sources 31, 54 · Verified Oct 2, 2026
The projects we tracked in October
The map as published on November 2, 2026. It is frozen with this issue; later corrections appear on the current map. Filled dots: started. Solid ring: approved. Dashed: filed. Shaded circles show a tract's stated acreage, not its property line.
| Project | Size | Status | Last change | Verified |
|---|---|---|---|---|
| Old Register Road PUD expansion Old Register Rd and US 301 S, Statesboro | 237.59 acres; about 1,173 units planned: ~500 apartments, 225 student cottages, 202 townhomes, 246 homes; hotel, offices, retail | Approved VSB Development. Annexation of 99.53 acres and PUD expansion approved Aug 19, 2025. Unit counts are plan figures. | Aug 2025 Statesboro PC packet, Aug 5, 2025 Grice Connect, Aug 19, 2025 | Oct 2, 2026 |
| Herman Rushing Road townhomes 285 Herman Rushing Rd, Statesboro | About 198 townhomes on 38.54 acres | Approved Blue Water Bulloch. Annexation and R-2 rezoning approved 4-1 May 20, 2025. | May 2025 Statesboro Herald, May 2025 Statesboro PC packet, May 6, 2025 | Oct 2, 2026 |
| Hunnicutt subdivision US 80 East at Hagan Ln, Bulloch County | 134 lots on 51 acres | Approved County rezoning AG-5 to R-8 approved 3-2 | Aug 2025 Grice Connect, Aug 5, 2025 | Oct 2, 2026 |
| Zetterower Road residential Zetterower Rd, Statesboro | 17.83 acres to R-4 (high density); 192 apartments (independent senior living and multifamily) | Filed Zack Smith Properties. Council tabled to Nov 17, 2026 for GDOT access. | Sep 2026 Statesboro PC packet, Sept 1, 2026 Statesboro council agenda, Sept 15, 2026 Statesboro Brief, Sept 21, 2026 | Oct 2, 2026 |
| Coca-Cola bottling plant redevelopment 401 S Main St, Statesboro | 7.54 acres; 108 apartments (240 beds); restaurant and brewery in the 1920 warehouse | Approved OZ Business. PUD rezoning and variance approved unanimously Aug 18, 2026. | Aug 2026 Statesboro council minutes, Aug 18, 2026 Statesboro Brief, Aug 24, 2026 | Oct 2, 2026 |
| Georgia Southern Foundation hotel and conference center Tillman Rd between Fair Rd and S Main St, Statesboro | 13.5 acres; hotel, conference center, alumni condominiums | Approved Rezoned to mixed use June 16, 2026; developer and brand not announced | Jun 2026 Statesboro council minutes, June 16, 2026 Statesboro Brief, May 18, 2026 | Oct 2, 2026 |
| Statesboro Summit rehabilitation Statesboro | 98 units; up to $12 million in bonds | Approved Housing authority bond issuance approved Sept 15, 2026 (rehab, not new units) | Sep 2026 Statesboro Brief, Sept 21, 2026 | Oct 2, 2026 |
| Kroger Marketplace Veterans Memorial Pkwy at Cypress Lake Rd, Statesboro | 99,000 SF store; $45.7 million; anchors a 21-acre center | Started Groundbreaking Aug 6, 2026; opening fall 2027. Rezoned to mixed use Dec 2, 2025, with a 20% residential requirement on the side facing Whispering Pines. | Aug 2026 Statesboro council minutes, Dec 2, 2025 Statesboro council minutes, May 19, 2026 WTOC, Aug 6, 2026 | Oct 2, 2026 |
| Northside Drive store reuse Northside Dr E, Statesboro | Academy Sports (47,448 SF, former Publix); HomeGoods (former Kmart) | Started HomeGoods opened in the former Kmart. Academy Sports has sign variances (May 19, 2026) for the former Publix; construction start not confirmed. | May 2026 Statesboro council minutes, May 19, 2026 Statesboro Brief, Feb 16, 2026 | Oct 2, 2026 |
| Fortner Road annexation Fortner Rd west of Crabby Ln, Metter | 46.76 acres; highway commercial zoning proposed for 990 Fortner Rd | Filed Annexation and rezoning hearing Sept 14, 2026; use not disclosed; outcome not yet confirmed | Sep 2026 Metter public notice, Aug 12, 2026 Metter public notice, 990 Fortner Rd | Oct 2, 2026 |
| Burkhalter Road data center 6539 Burkhalter Rd, Statesboro | 26.49 acres; ~230,000 SF; up to 99 MW requested; $1.2 billion over 10 years; 12 jobs | Approved 4AM Development. Rezoning approved 3-2 Aug 18, 2026. Special use permit not yet filed. Residents sued Sept 17. | Sep 2026 Statesboro council minutes, Aug 18, 2026 Statesboro Brief, Aug 17, 2026 Statesboro Brief, Sept 28, 2026 | Oct 2, 2026 |
| Hyundai suppliers on US 301 South Bruce Yawn Commerce Park, Gateway park and nearby sites | Ajin/Joon Georgia $317M, 630 jobs; Ecoplastic $205M, 456 jobs; Hanon Systems $40M, 160 jobs | Started Ajin/Joon and Ecoplastic are operating; hired as of Aug 2026: Ajin/Joon 430, Ecoplastic 268. Hanon lists its Statesboro facility among its production sites; current employment is not published. Ecoplastic land request for worker housing tabled June 2026. | Aug 2026 The Current, Sept 6, 2026 Statesboro Herald, June 2026 Hanon Systems, company network Gov. Kemp: Hanon, May 23, 2023 | Oct 2, 2026 |
| Gateway Regional Industrial Park Phase II Off US 301 S, Statesboro | 69-acre Cannady site; $1.52 million state grant to make it pad-ready | Approved OneGeorgia grant awarded June 2025; listing location checked October 27, 2026. Pad-ready work completion unverified. | Jun 2025 Expansion Solutions, June 2025 | Oct 2, 2026 |
| revalyu recycling plant Gateway Regional Industrial Park, Statesboro | 43 acres; $200 million+; 121 jobs in two phases | Started Groundbreaking Oct 2023; phase one was due Q3 2025. Current operating status not confirmed. | Oct 2023 Statesboro Herald, Oct 6, 2023 EPD facility address | Oct 27, 2026 (location; stage remains unconfirmed) |
| American Aero 16274 US 80 E, Brooklet | 45,000 SF; from 100+ to about 300 employees | Started Groundbreaking March 24, 2026; completion expected end of 2026 | Mar 2026 Grice Connect, March 2026 | Oct 2, 2026 |
| Metter-Candler I-16 Industrial Park Lytell St, Metter | 130+ acres; DAS Corp. (300 jobs) and Doowon Climate Control ($30M+, 200 jobs) announced | Approved $103,500 state grant (Jan 2026) to renew certification and expand the park. DAS and Doowon were announced in 2023 and 2024; current operations and hiring not confirmed. | Jan 2026 The Georgia Virtue, Jan 31, 2026 Georgia DED: DAS, Sept 2023 Gov. Kemp: Doowon, Feb 6, 2024 | Oct 2, 2026 |
| Southeast Bulloch High School Brooklet-Denmark Rd | Up to $165 million; $50.3 million in bonds sold | Approved Bonds sold Feb 2026; construction planned from summer 2026; opening about 2029-30. Start not confirmed. | Feb 2026 WSAV, 2026 Statesboro Brief, Feb 16, 2026 | Oct 2, 2026 |
| Southeast corridor roads Burkhalter, Harville and Cawana roads, Statesboro | Planned: two roundabout projects ($3.3 million; $2.75 million) and Burkhalter widening ($2.8 million); $193,500 corridor study | Approved City-county cost-sharing agreement Feb 2026; county study contract Sept 1, 2026. The city counts about 1,342 units planned in the corridor. | Sep 2026 Statesboro Brief, Feb 23, 2026 Statesboro Herald, June 2025 (units and road costs) Statesboro Brief, Aug 31, 2026 | Oct 2, 2026 |
How we drew this market
Statesboro and Metter sit 25 miles apart on I-16. They share a labor pool and the same pull from the east, so we treat them as one market. We cut it into eight areas by what each is mostly adding: two interchanges where the jobs land, a planned new center on Old Register Road, downtown and the campus, two growth edges, a retail corridor, and downtown Metter as a satellite town. The rules are the same in every market we cover.
Two drivers sit outside the market. Hyundai's Metaplant in Bryan County had hired 4,365 of its promised 8,500 workers by June 2026.46 OpenAI's Project Camellia in Effingham County, a $20 billion data center campus, adds a second pull.62 Neither is on the ledger. Both shape it.
Coverage this month
Statesboro City Council minutes were read for December 2025 through August 2026, plus the September 1 and September 15 agendas. The city's online index does not list earlier 2025 council records, so council outcomes from April to November 2025 come from planning commission packets and press. Statesboro planning commission agendas, packets, and minutes were read for May 2025 through October 2026, except where a month's files did not load. Bulloch County Commission actions come from press and published meeting rundowns; its agendas were not read directly. Brooklet is covered through press only. Metter's February 2026 council minutes and its public notices were read; Candler County Commission was not. Georgia's regional-impact filing system could not be reached this month. If you see something we missed or got wrong, tell us and we will correct it in the next issue.
How we count: the pipeline includes filed, approved, and started projects in Bulloch and Candler counties. Plan figures count at their approved maximum. Project figures without a number here come from the list below, where each row carries its source. Bulloch and Candler counts come from Census estimates.
- U.S. Census Bureau, QuickFacts: Bulloch County and Candler County, Georgia (population and housing units, July 1, 2025; building permits, 2025; employment, 2023). Primary. Link · Checked October 2, 2026.
- City of Statesboro, Planning Commission Agenda and Packet, August 5, 2025. Primary. Link · Checked October 2, 2026.
- Grice Connect, Statesboro City Council approves property tax relief referendum, annexations, and housing programs , August 2025. Press. Link · Checked October 2, 2026.
- Grice Connect, county commission coverage, June, August, and September 2025. Press. June · August · September · Checked October 2, 2026.
- Statesboro Herald, Commissioners extend both moratoriums, step toward outright ban on data centers , May 2026. Press. Link · Checked October 2, 2026.
- Statesboro Herald, City looks toward upgrades of Burkhalter and Cawana roads and their intersections , June 2025; and The Statesboro Brief, February 23, 2026 (city-county cost sharing). Press. Herald · Brief · Checked October 2, 2026.
- Grice Connect, Brooklet annexes 278 acres to be used for single-family developments , July 18, 2024. Press. Link · Checked October 2, 2026.
- The Current, Hyundai suppliers make hiring progress in exchange for public incentives , September 6, 2026. Press. Link · Checked October 2, 2026.
- Expansion Solutions, Bulloch County secures $1.5M state grant for industrial site development , June 2025. Press. Link · Checked October 2, 2026.
- WTOC, Taxpayer dollars impacted after Aspen Aerogels abandons Bulloch County , April 2, 2025. Press. Link · Checked October 2, 2026.
- Georgia Department of Economic Development, DAS Corp. to bring 300 automotive jobs to Metter , September 2023. Primary. Link · Checked October 2, 2026.
- Office of the Governor, Second automotive supplier creating 200 new jobs in Candler County , February 6, 2024. Primary. Link · Checked October 2, 2026.
- The Georgia Virtue, Candler County Industrial Authority to receive state funds to expand industrial park , January 31, 2026. Press. Link · Checked October 2, 2026.
- City of Metter, Public hearing notice: annexation and rezoning of 46.76 acres on Fortner Road , August 12, 2026. Primary. Link · Checked October 2, 2026.
- City of Statesboro, City Council Minutes, August 18, 2026. Primary. Link · Checked October 2, 2026.
- The Statesboro Brief, editions of August 17 and September 28, 2026 (fiscal study; lawsuit). Press. Aug 17 · Sept 28 · Checked October 2, 2026.
- The Statesboro Brief, The data center ban died on one vote, and 21 of our neighbors get the next word , September 7, 2026. Press. Link · Checked October 2, 2026.
- Economic Impact Group, LOCI fiscal impact analysis: 100MW data center in Candler County , February 2026, posted by the City of Metter. Primary. Link · Checked October 2, 2026.
- The Statesboro Brief, Brooklet wildfire hits 389 acres, data center ban heads to Aug. 4 vote , July 27, 2026. Press. Link · Checked October 2, 2026.
- WTOC, Kroger breaks ground on $45.7 million Marketplace in Statesboro , August 6, 2026. Press. Link · Checked October 2, 2026.
- The Statesboro Brief, Edition 19 , February 16, 2026. Press. Link · Checked October 2, 2026.
- Statesboro Herald, Council approves Herman Rushing Rd. annexation for 198 townhome units , May 2025; and City of Statesboro, City Council minutes, April 21, 2026 (East Olliff Street). Press; Primary. Herald · Council, April 21, 2026 · Checked October 2, 2026.
- Hanon Systems, Global network , checked October 2026; Office of the Governor, May 23, 2023. Primary. Hanon · Governor · Checked October 2, 2026.
- Statesboro Herald, Recycling company revalyu breaks ground on Bulloch factory , October 6, 2023. Press. Link · Checked October 2, 2026.
- City of Metter, public notice, August 21, 2026. Primary. Link · Checked October 2, 2026.
- City of Statesboro, City Council Minutes, August 18, 2026. Primary. Link · Checked October 2, 2026.
- City of Statesboro, City Council Agenda, September 15, 2026. Primary. Link · Checked October 2, 2026.
- The Statesboro Brief, Ten neighbors spoke, and the council kept your tax rate where it was , September 21, 2026. Press. Link · Checked October 2, 2026.
- The Statesboro Brief, The gas tax comes off Tuesday, and the data center developers say they're moving ahead , September 28, 2026. Press. Link · Checked October 2, 2026.
- The Statesboro Brief, The data center ban died on one vote, and 21 of our neighbors get the next word , September 7, 2026. Press. Link · Checked October 2, 2026.
- The Statesboro Brief, The county decides on data centers Tuesday, and your insurance rating just improved , August 31, 2026. Press. Link · Checked October 2, 2026.
- City of Metter, Public hearing notice: annexation and rezoning of 46.76 acres on Fortner Road , August 12, 2026, via the Metter-Candler Advertiser. Primary. Link · Checked October 2, 2026.
- City of Metter, Public hearing notice: zoning for 990 Fortner Road , 2026, via the Metter-Candler Advertiser. Primary. Link · Checked October 2, 2026.
- City of Metter, Project Back in Black fiscal impact , September 22, 2026. Primary. Link · Checked October 2, 2026.
- Economic Impact Group, LOCI fiscal impact analysis: 100MW data center in Candler County , February 2026, posted by the City of Metter. Primary. Link · Checked October 2, 2026.
- City of Metter, Data Center Task Force , September 15, 2026. Primary. Link · Checked October 2, 2026.
- City of Statesboro, Planning Commission Agenda and Packet, August 5, 2025. Primary. Link · Checked October 2, 2026.
- Grice Connect, Statesboro City Council approves property tax relief referendum, annexations, and housing programs , August 2025. Press. Link · Checked October 2, 2026.
- Statesboro Herald, Council approves Herman Rushing Rd. annexation for 198 townhome units , May 2025. Press. Link · Checked October 2, 2026.
- Grice Connect, Commissioners approve contested subdivision, legal contract, and jail bonds , August 2025. Press. Link · Checked October 2, 2026.
- City of Statesboro, City Council Minutes, June 16, 2026. Primary. Link · Checked October 2, 2026.
- City of Statesboro, City Council Minutes, December 2, 2025. Primary. Link · Checked October 2, 2026.
- WTOC, Kroger breaks ground on $45.7 million Marketplace in Statesboro , August 6, 2026. Press. Link · Checked October 2, 2026.
- City of Statesboro, City Council Minutes, May 19, 2026. Primary. Link · Checked October 2, 2026.
- The Statesboro Brief, Edition 19: moratoriums, fire funding and record growth , February 16, 2026. Press. Link · Checked October 2, 2026.
- The Current, Hyundai suppliers make hiring progress in exchange for public incentives , September 6, 2026. Press. Link · Checked October 2, 2026.
- Statesboro Herald, Proposed Ecoplastic land purchase could bring worker housing development to Bulloch County , June 2026. Press. Link · Checked October 2, 2026.
- Expansion Solutions, Bulloch County secures $1.5M state grant for industrial site development , June 2025. Press. Link · Checked October 2, 2026.
- Grice Connect, American Aero breaks ground on new 45,000-square-foot facility in Brooklet , March 2026. Press. Link · Checked October 2, 2026.
- The Georgia Virtue, Candler County Industrial Authority to receive state funds to expand industrial park , January 31, 2026. Press. Link · Checked October 2, 2026.
- Georgia Department of Economic Development, DAS Corp. to bring 300 automotive jobs to Metter , September 2023. Primary. Link · Checked October 2, 2026.
- Office of the Governor, Second automotive supplier creating 200 new jobs in Candler County , February 6, 2024. Primary. Link · Checked October 2, 2026.
- WSAV, Plans for new Southeast Bulloch High School moving forward , 2026. Press. Link · Checked October 2, 2026.
- The Statesboro Brief, Edition 20: moratoriums pass, grocery shake-up , February 23, 2026. Press. Link · Checked October 2, 2026.
- Statesboro Herald, Commissioners extend both moratoriums, step toward outright ban on data centers , May 2026. Press. Link · Checked October 2, 2026.
- City of Statesboro, City Council Minutes, June 2, 2026 (Ordinance 2026-01, technological facilities and data centers). Primary. Link · Checked October 2, 2026.
- U.S. Census Bureau, QuickFacts: Bulloch County and Candler County, Georgia (population and housing units, July 1, 2025; building permits, 2025). Primary. Link · Checked October 2, 2026.
- The Statesboro Brief, The mayor broke the tie, and the Burkhalter rezoning passed , August 24, 2026. Press. Link · Checked October 2, 2026.
- The Statesboro Brief, A $1.2 billion number, 12 jobs, and Tuesday's data center vote , August 17, 2026. Press. Link · Checked October 2, 2026.
- City of Statesboro, City Council Agenda, September 17, 2024 (AN 24-07-01, V 24-07-02, RZ 24-07-03). Primary. Link · Checked October 2, 2026.
- The Statesboro Brief, Edition 32: new GSU hotel project , May 18, 2026. Press. Link · Checked October 2, 2026.
- The Statesboro Brief, Brooklet wildfire hits 389 acres, data center ban heads to Aug. 4 vote , July 27, 2026 (Project Camellia, Effingham County). Press. Link · Checked October 2, 2026.
- City of Metter, Regular Meeting Minutes, February 9, 2026. Primary. Link · Checked October 2, 2026.
- WTOC, Taxpayer dollars impacted after Aspen Aerogels abandons Bulloch County , April 2, 2025. Press. Link · Checked October 2, 2026.
- Grice Connect, Bulloch County commissioners reject subdivision plans, raise concerns over water and fire protection , September 2025. Press. Link · Checked October 2, 2026.
- Grice Connect, Chairman Bennett breaks tie vote to deny 59-lot residential subdivision , June 2025. Press. Link · Checked October 2, 2026.
- City of Statesboro, Planning Commission Agenda and Packet, May 6, 2025. Primary. Link · Checked October 2, 2026.
- City of Statesboro, Planning Commission Agenda and Packet, September 1, 2026. Primary. Link · Checked October 2, 2026.
- Hanon Systems, Global network (Hanon Systems Statesboro, 8540 Zell Miller Parkway), checked October 2026; and Office of the Governor, Automotive supplier Hanon Systems to create 160 new jobs in Bulloch County , May 23, 2023. Primary. Hanon · Governor · Checked October 2, 2026.
- Statesboro Herald, Recycling company revalyu breaks ground on Bulloch factory , October 6, 2023. Press. Link · Checked October 2, 2026.
- Statesboro Herald, City looks toward upgrades of Burkhalter and Cawana roads and their intersections , June 2025. Press. Link · Checked October 2, 2026.
- City of Metter, Public notice on data center inquiries and airport-area annexation , August 21, 2026, via the Metter-Candler Advertiser. Primary. Link · Checked October 2, 2026.
Original project records retain their verification dates. Park and land discovery sources checked October 27, 2026; dated source claims and unresolved questions are stated above.