Statesboro and Metter: what was filed, approved, and started in October 2026

By Daniel Sexton · Issue 1

Published
October 11, 2026 (prepared October 2; parks and land added October 27)
Records through
September 28, 2026, plus the October 27 parks and public-land pass
Covers
Statesboro, Brooklet, Bulloch County, Metter and Candler County along I-16

October 2026 · as last updated October 27

This is the October report as it stood when November began. It is frozen: later corrections are noted at the top of this page, and the current report is on the market page.

Where the I-16 market is growing.

Bulloch County had 86,949 people and 36,248 housing units in 2025, up 9.2 percent in population since 2020. Candler County had 11,275 people, up 2.5 percent.1 Since April 2025, councils and commissions here have approved about 1,700 homes and apartments with published counts, across six projects: Old Register Road (1,173), Herman Rushing Road (198), the Hunnicutt subdivision (134), the Coca-Cola site (108), Maria Sorrell Road (66), and East Olliff Street (19).2422 That is about 5 percent of Bulloch's housing, or a little over a year of construction at 2025's pace of 1,389 permits.1 Add the other units the city counts in its southeast corridor and Brooklet's 300-acre annexation, and the pipeline is about 3,300 units: nearly a tenth of the county's housing.67 Approved is not built.

Industrial parks, innovation facilities and development land

Added October 27, 2026. This is a first inventory of parks, public development assets and related land opportunities. Public involvement can mean ownership, a development-authority role, a university partnership or an infrastructure investment. It does not mean that every parcel is publicly owned or available. Park profiles and early leads are separate from the construction table and its totals.

Where to look. Gateway and Cannady lie south of Statesboro, while Bruce Yawn is the distinct I-16 / US 301 park formerly called Southern Gateway. Airport Industrial Park is north of town. Perimeter Center and Ogeechee Tech's training facility are another part of the industrial ecosystem. Downtown Statesboro and Metter have incubator facilities rather than large industrial land offerings. Metter's industrial park has announced manufacturing and agribusiness projects, with a separate expansion proposal to follow.

The new public asset is already open. Ogeechee Tech reports that training began October 5 and the Georgia Training Center for Industrial Operations opened October 15. It is about 40,000 square feet and a $27 million investment, with land contributed by the development authority. It belongs in the public-development layer as an operating facility, not active construction. College announcement.

Purple markers show seven supported park or facility locations. The nine descriptions below also retain Bruce Yawn and Perimeter Center while their map anchors are checked. Markers are context locations; they do not outline the parks or identify all available lots.

Park / sitePublic roleWhat is there / going inAvailable / next check
Gateway Regional Industrial Park
Gateway Boulevard / AJ Riggs Road, Bulloch County
Established industrial district
Development-authority industrial district; ownership and commitments vary by parcel.Existing: Authority identifies Walmart at Gateway without specifying Phase I or II. Gateway II tenants are described separately below.
Incoming: revalyu's recycling facility is tracked separately; its current operating status remains unconfirmed.
No park-wide vacant-land balance established. Occupied or committed parcels are not available public inventory.
Authority park inventory · EPD revalyu address
Gateway II / Cannady Site
JC Cannady Road off US 301 South, Bulloch County
Approximately 70 acres marketed
DABC-led site preparation and recruitment; current parcel title and reservations need confirmation.Existing: DABC names Great Dane and WL Plastics in the park and revalyu as a planned facility.
Incoming: June 2025 grant supports grading and sewer work; completion of the pad-ready work has not been verified.
State-hosted listing updated January 14, 2026 offers 69.70 acres for sale or lease, while its total-acre field says 121.80. Treat these as unreconciled offering/parent figures, not additive supply. Price unit unconfirmed.
State-hosted offering · DABC grant announcement
Bruce Yawn Commerce Park
I-16 / US 301 interchange, Bulloch County
Also called Southern Gateway Commerce Park
Authority-sponsored park with committed private industrial projects; no current vacant balance established.Existing: AJIN Georgia opened in July 2024. Southern Gateway is the former name of this park, not another park.
Incoming: Former Aspen project reuse and nearby Northpoint warehouse plans need current parcel reconciliation.
Older marketing acreage is not reliable current availability. Current ownership, commitments and remaining land need checking. Described here without an unverified map pin.
State park-name record · AJIN opening, contractor
Airport Industrial Park
US 301 North / Statesboro–Bulloch County Airport
20–175 acres in a dated offering
Authority-promoted industrial location; current individual titles and airport lease restrictions need checking.Existing: Industrial location beside the public airport.
Incoming: Airport hangar leases, land disposal and utility works are separate leads below; no new industrial tenant confirmed here.
State-hosted listing updated August 12, 2025 advertises 20–175 acres. Confirm present availability and infrastructure before relying on it; this is not a current vacancy certification.
State-hosted offering · Authority park inventory
Perimeter Center Park
US 301 South beside Ogeechee Technical College, Statesboro
Office and light-industrial park
Authority-promoted business park; park-wide public fee ownership not established.Existing: Smaller commercial tenants in an established office-park setting.
Incoming: The new Georgia Training Center for Industrial Operations nearby is described separately; it is a public facility, not vacant park land.
No current available-lot or suite inventory established. Park boundary and map anchor remain unconfirmed; retained here for coverage.
Authority description
Georgia Training Center for Industrial Operations
66 AJ Riggs Road, Statesboro
39,700 SF; approximately $27 million; OPEN
Ogeechee Tech / TCSG public facility. DABC contributed land; county contributed access-road funding.Existing: Training began October 5 and the grand opening was October 15, 2026. Labs support industrial systems, automation and robotics.
Incoming: An operating workforce asset for regional manufacturers, not an active-construction project.
College offers training and employer programs; no vacant development-land offering implied. Facility page gives 39,700 SF; opening release rounds to 40,000.
College opening announcement · Facility and address
Statesboro City Campus / Business Innovation Group
58 East Main Street and adjoining City Campus buildings, Statesboro
Downtown incubator and innovation facilities
City / downtown-authority / Georgia Southern partnership; current building-by-building title and allocation not fully reviewed.Existing: Business incubation, fabrication and business-assistance programs, with meeting facilities.
Incoming: Current expansion or construction phase not established in this pass.
University offers meeting-space rental subject to scheduling. Incubator vacancies and lease terms require confirmation; this is not a vacant land sale.
University BIG programs · Space rental
Metter–Candler I-16 Industrial Park
West Lytell Street / GA 121, Metter
130+ acres advertised; remaining supply unverified
Candler County Industrial Authority markets the park; public or bond-lease title does not make occupied land available.Existing: DAS and Doowon announced manufacturing projects here. 4 Fungi's Regenerative held a greenhouse groundbreaking in November 2023; current operations and phases need checking.
Incoming: Certification/expansion grant and a separate 24.97-acre Fortner Road addition are being tracked. The latter's final outcome is unverified.
Undated authority page advertises 130+ acres, not a reconciled vacant balance after tenant commitments. Old conceptual parcel/building plans are not current offers. Ask the authority for remaining lots and terms.
Authority inventory · County-posted park tenant agreement · 4 Fungi groundbreaking · Fortner notice
Georgia Grown Innovation Center
25 South Terrell Street, Metter
Agribusiness incubator / innovation facility
Created by City of Metter with Georgia Grown and Georgia Southern partners; current deed and operating lease not reviewed.Existing: Small agribusiness support, consulting, networking and meeting facilities.
Incoming: No new construction phase confirmed; tenant businesses' own expansions are separate projects.
Membership and scheduled meeting-space services are offered. Current incubator-space vacancy and terms require confirmation; not an industrial land offering.
Center partnership and services · University space and address

Metter data centers: two proposals, different jurisdictions

The city's August 21 notice said no developer had approached it about a data center inside city limits. WTOC subsequently reported September 15 that two separate groups were exploring sites: one inside Metter west of US 129 off East Hiawatha Street, and another near the airport in unincorporated Candler County. Mayor Rashida Taylor said the city had not received a formal application as of that report. The city also sought data-center task-force participants. Current city filings and task-force outcomes remain unverified; the September statement should not be read as a current application search.

For the airport area, DatacenterDynamics reported October 12 a Canoochee River RV Resort LLC proposal on about 470 acres at 2700 Airport Road: five buildings of up to 250,000 square feet each, a PUD request and DRI 4846. The same report says Candler commissioners unanimously rejected a moratorium earlier in October. That vote does not approve the development. The airport group may correspond to this filing; the relationship to the city's 100-megawatt Back in Black study is not established. These descriptions are not added together as three committed campuses.

Other projects and land leads to follow

These discoveries are new to this report, not necessarily newly announced. Proposed quantities and historical approvals do not establish current construction or available supply. Possible aliases remain linked rather than counted twice.

Project / opportunityWhat is public / still checkingSource
Fortner Road industrial-park additionMetter city notice proposes 24.97 acres between West Lytell and West Hiawatha for light-industrial zoning. October 26 planning review outcome is unverified; November 9 council hearing was scheduled. Distinct from the older 46.76-acre annexation.October 14 city notice
Northpoint / Rocky Road warehouses; probable Exit 116 aliasApril 2023 reporting describes rezoning about 359.6 acres for ten warehouses, approximately 3.1 million SF. DRI 3862 describes a similar earlier 3.25-million-SF program. Probable aliases, not additive supply; current land control and construction remain unknown.April 11, 2023 reporting
4 Fungi's Regenerative, Metter industrial parkWTOC reported a November 15, 2023 greenhouse groundbreaking and $27 million investment. Current production and later processing phases remain unconfirmed. An announced park project, not a verified current vacancy or completed phase.Groundbreaking report
YWK supplier site, 8527 GA 119 SouthJune 2023 reporting describes heavy-industrial rezoning of 21.94 acres for a 200,000-SF parts plant. Operator, current ownership and construction are unresolved. This is outside the authority parks.Statesboro Herald
Warner Tract Industrial / Portman, Bryan–Bulloch boundaryReported September 2026 warehouse proposal spans both counties. Project-wide figures include about 178 acres and 2 million SF; the county split is unknown. No quantities are assigned to Bulloch totals and no approval or construction start is inferred.Reported DRI filing
Rushing Tract PUD, Elmer Phillips Road / GA 67County staff report identifies 39.05 acres and 400 requested townhome/apartment units plus commercial outparcels in 2022. Current approval validity and construction need checking. An unlabeled regional-map number is not evidence of 835 acres; quantities remain excluded from totals.County staff report, May 2022
Gas Pro Travel Center #108, US 80 / BurkhalterDRI 4381 describes a 2025 truck-stop proposal with retail, restaurant and fuel facilities. Current permits or opening have not been established.Regional review record
Waterford Subdivision, BrookletDRI 4505 describes 728 proposed detached lots on Parker Avenue North. Relationship to earlier Brooklet/Weyerhaeuser coverage needs checking; no extra units are added to totals.Regional review record
Highway 301 Logistics / FoxfieldHistorical DRI 3698 describes about 1.3 million SF. A listed parcel overlaps the Flying J record; possible Bruce Yawn project/parcel reuse is unresolved. Do not count it as separate available warehouse supply yet.Regional review record
Statesboro airport: land releaseFAA March 2026 notice sought comment on releasing and selling about 1.5 acres for non-aeronautical use. Final release, buyer and deed remain unverified. A disposal request is not a currently open offering.FAA notice
Statesboro airport: hangars and utilitiesMarch 17, 2026 agenda separately names proposed 30-year ground leases with HDM Enterprises and Statesboro Airport JV. Reporting also describes two corporate hangars and water/sewer funding efforts. Executed leases, project overlaps and current works need reconciliation.City council packet
Downtown Statesboro: public redevelopment landThe 2022 city master plan identifies underused land east of the railroad near City Campus and the McTell Trail, some city-owned. Current parcels and a live developer solicitation have not been established.City master plan

Coverage remains partial. The October 27 pass combined public authority inventories, dated offerings, college and city sources, airport leads, local reporting and the Coastal Regional Commission map. A completed DRI review does not mean completed construction. Candler belongs to Heart of Georgia Altamaha, so an empty result in the coastal map is not a Candler inventory. Current titles and vacancies, all county minutes, Fortner outcomes and project aliases remain open. None of the park acreages or early concepts above is added to a new aggregate supply total.

Old Register Road becomes a new center

One project is most of the recent approvals. In August 2025 Statesboro annexed 99.53 acres and expanded a planned development on Old Register Road and US 301 South to 237.59 acres. The plan shows about 1,173 units: some 500 apartments, 225 student cottages, 202 townhomes, and 246 houses, with a hotel, offices, a bank, and retail.23 That is about 70 percent of everything approved since April 2025. It sits between the campus and the interchange, which is where the market's two engines meet.

Growth shifts inside the city

The Bulloch County Commission denied at least 165 rural subdivision lots in 2025 and approved about 200.4 In February 2026 it froze all residential rezonings while it writes an impact fee ordinance, and the freeze now runs through December 31.5 Over the same stretch, Statesboro approved about 1,500 units, most through annexation. Growth that would have spread across the county is landing inside the city, where there is water and sewer. Roads are the cost. The city counts about 1,342 units planned in the Burkhalter and Cawana corridor and has about $8.9 million in roundabouts and widening planned there, with the county sharing costs.6

The jobs land at the interchanges

Hyundai's Metaplant, east on I-16 in Bryan County, had hired 4,365 of its promised 8,500 workers by June 2026. Three of its suppliers sit along US 301 South. Two had hired 698 of the 1,086 jobs they promised: Ajin and Joon Georgia 430, Ecoplastic 268.8 The third, Hanon Systems, announced 160 jobs and lists its Statesboro plant among its production sites; it has not published a headcount.23 The county keeps preparing land: a $1.5 million state grant to make a 69-acre site in Gateway Park pad-ready.9 Two question marks sit nearby. The Aspen Aerogels plant at the interchange was abandoned half-built in February 2025.10 The $200 million revalyu recycling plant in Gateway park broke ground in 2023 with phase one due in late 2025; we have found no report on whether it is running.24

Metter: jobs without houses

Two Hyundai suppliers announced 500 jobs at Metter's I-16 industrial park, DAS with 300 and Doowon with 200.1112 Candler County's employers counted 2,289 jobs in 2023, so the announcements would add about a fifth. The county recorded 7 new housing units permitted in 2025.1 If those jobs materialize and housing production stays that low, Metter would likely depend heavily on workers commuting from outside the city. The industrial park is getting a state grant to renew its certification and expand, and the city is weighing a 46-acre annexation at the exit.1314

Data centers, three ways

Statesboro rezoned 26.49 acres on Burkhalter Road for a 230,000-square-foot data center. A fiscal study puts it at $1.2 billion over 10 years with 12 jobs. Residents have sued.1516 Bulloch County kept its moratorium and set up a citizen working group after a ban failed by one vote.17 Metter posted a fiscal study for a 100-megawatt concept with $1.1 billion in real property and 40 jobs. That study is not a commitment to build. Later public reporting identifies separate city and airport-area data-center proposals, described in the October 27 update below.1825 The numbers explain the interest: large tax bases and few jobs. OpenAI's $20 billion campus in Effingham County shows how big the pull can get.19

Retail moves to the edge

Kroger broke ground on a 99,000-square-foot Marketplace on Veterans Memorial Parkway, anchoring a 21-acre center due in fall 2027.20 On Northside Drive, the old Publix and Kmart boxes are filled again with Academy Sports and HomeGoods.21 New space goes where the new rooftops are. Older corridors are being reused, not abandoned.

What we're watching

  • Whether the county adopts impact fees and lifts its rezoning freeze after December 31
  • The Burkhalter Road lawsuit and the special use permit that has not been filed
  • What the Fortner Road annexation in Metter is for
  • Whether revalyu and Hanon report hiring
  • Whether Blue Fern Village's 1,794 units come back to the council

New this month

September 2026 records. The project list below covers April 2025 through September.

Burkhalter Road data center: lawsuit filed Approved

6539 Burkhalter Road, Statesboro

Eleven residents and Coastal Communities United asked the court to overturn the August 18 rezoning, which passed 3-2 on the mayor's tiebreaking vote.2629 The developer, 4AM Development, has not yet filed for the special use permit the city's data center ordinance requires and says it intends to proceed.2956

Sources 26, 29, 56 · Verified Oct 2, 2026

Bulloch County data center ban fails, 4-3

Unincorporated Bulloch County

On September 1 the commission voted down a text amendment that would have banned data centers in commercial and industrial zones. The chairman broke the tie. The commission created a 21-member citizen working group. The moratorium on data center applications stays in place through December 31, 2026.30

Source 30 · Verified Oct 2, 2026

Zetterower Road rezoning Filed

Zetterower Road, Statesboro

Zack Smith Properties asked to rezone 17.83 acres to R-4, high-density residential, for 192 apartments: independent senior living and multifamily.68 The council tabled the request to November 17 while the developer works out access with GDOT.28 A 198-apartment request on nearly the same site drew a staff recommendation of denial in 2025.

Sources 27, 28, 68 · Verified Oct 2, 2026

Statesboro Summit rehabilitation Approved

Statesboro

The council approved up to $12 million in housing authority bonds to rehabilitate 98 units, with no city debt.28

Source 28 · Verified Oct 2, 2026

Tormenta Way rezoning and a new housing incentive Filed

Tormenta Way, Statesboro; citywide

The September 15 agenda carried a request by Techwood Lodging to rezone 3.8 acres from PUD to mixed use for a 122-room WoodSpring Suites extended-stay hotel.68 It also carried an ordinance replacing the city's subdivision incentive program with a workforce housing incentive program.27 Outcomes will appear in the minutes.

Sources 27, 68 · Verified Oct 2, 2026

Fortner Road annexation Filed

Fortner Road west of Crabby Lane, Metter

Metter held a hearing on September 14 on annexing and rezoning 46.76 acres. A separate notice set highway commercial zoning for 990 Fortner Road.3233 The applicant and the use were not named.

Sources 32, 33 · Verified Oct 2, 2026

Metter publishes a data center study

Metter / Candler County; study-to-project and site match unresolved

The city posted a February 2026 fiscal impact analysis for a 100-megawatt concept called Project Back in Black. Its assumptions include $1.1 billion in real property, $5.5 billion in equipment and 40 jobs.3435 The study does not establish a committed developer, a construction start or a confirmed site. Subsequent city and county proposals are described in the October 27 update below; their relationship to this study remains unresolved.

Sources 34, 35, 36, 72 · Verified Oct 2, 2026

Burkhalter Road corridor study Approved

Burkhalter Road, Bulloch County and Statesboro

The county approved a $193,500 contract with Kimley-Horn for a 2.2-mile corridor study on September 1.31 It follows a February city-county agreement to share the cost of improvements on Burkhalter, Harville, and Cawana roads.54

Sources 31, 54 · Verified Oct 2, 2026

The projects we tracked in October

The map as published on November 2, 2026. It is frozen with this issue; later corrections appear on the current map. Filled dots: started. Solid ring: approved. Dashed: filed. Shaded circles show a tract's stated acreage, not its property line.

ProjectSizeStatusLast changeVerified
Old Register Road PUD expansion
Old Register Rd and US 301 S, Statesboro
237.59 acres; about 1,173 units planned: ~500 apartments, 225 student cottages, 202 townhomes, 246 homes; hotel, offices, retailApproved
VSB Development. Annexation of 99.53 acres and PUD expansion approved Aug 19, 2025. Unit counts are plan figures.
Aug 2025
Statesboro PC packet, Aug 5, 2025
Grice Connect, Aug 19, 2025
Oct 2, 2026
Herman Rushing Road townhomes
285 Herman Rushing Rd, Statesboro
About 198 townhomes on 38.54 acresApproved
Blue Water Bulloch. Annexation and R-2 rezoning approved 4-1 May 20, 2025.
May 2025
Statesboro Herald, May 2025
Statesboro PC packet, May 6, 2025
Oct 2, 2026
Hunnicutt subdivision
US 80 East at Hagan Ln, Bulloch County
134 lots on 51 acresApproved
County rezoning AG-5 to R-8 approved 3-2
Aug 2025
Grice Connect, Aug 5, 2025
Oct 2, 2026
Zetterower Road residential
Zetterower Rd, Statesboro
17.83 acres to R-4 (high density); 192 apartments (independent senior living and multifamily)Filed
Zack Smith Properties. Council tabled to Nov 17, 2026 for GDOT access.
Sep 2026
Statesboro PC packet, Sept 1, 2026
Statesboro council agenda, Sept 15, 2026
Statesboro Brief, Sept 21, 2026
Oct 2, 2026
Coca-Cola bottling plant redevelopment
401 S Main St, Statesboro
7.54 acres; 108 apartments (240 beds); restaurant and brewery in the 1920 warehouseApproved
OZ Business. PUD rezoning and variance approved unanimously Aug 18, 2026.
Aug 2026
Statesboro council minutes, Aug 18, 2026
Statesboro Brief, Aug 24, 2026
Oct 2, 2026
Georgia Southern Foundation hotel and conference center
Tillman Rd between Fair Rd and S Main St, Statesboro
13.5 acres; hotel, conference center, alumni condominiumsApproved
Rezoned to mixed use June 16, 2026; developer and brand not announced
Jun 2026
Statesboro council minutes, June 16, 2026
Statesboro Brief, May 18, 2026
Oct 2, 2026
Statesboro Summit rehabilitation
Statesboro
98 units; up to $12 million in bondsApproved
Housing authority bond issuance approved Sept 15, 2026 (rehab, not new units)
Sep 2026
Statesboro Brief, Sept 21, 2026
Oct 2, 2026
Kroger Marketplace
Veterans Memorial Pkwy at Cypress Lake Rd, Statesboro
99,000 SF store; $45.7 million; anchors a 21-acre centerStarted
Groundbreaking Aug 6, 2026; opening fall 2027. Rezoned to mixed use Dec 2, 2025, with a 20% residential requirement on the side facing Whispering Pines.
Aug 2026
Statesboro council minutes, Dec 2, 2025
Statesboro council minutes, May 19, 2026
WTOC, Aug 6, 2026
Oct 2, 2026
Northside Drive store reuse
Northside Dr E, Statesboro
Academy Sports (47,448 SF, former Publix); HomeGoods (former Kmart)Started
HomeGoods opened in the former Kmart. Academy Sports has sign variances (May 19, 2026) for the former Publix; construction start not confirmed.
May 2026
Statesboro council minutes, May 19, 2026
Statesboro Brief, Feb 16, 2026
Oct 2, 2026
Fortner Road annexation
Fortner Rd west of Crabby Ln, Metter
46.76 acres; highway commercial zoning proposed for 990 Fortner RdFiled
Annexation and rezoning hearing Sept 14, 2026; use not disclosed; outcome not yet confirmed
Sep 2026
Metter public notice, Aug 12, 2026
Metter public notice, 990 Fortner Rd
Oct 2, 2026
Burkhalter Road data center
6539 Burkhalter Rd, Statesboro
26.49 acres; ~230,000 SF; up to 99 MW requested; $1.2 billion over 10 years; 12 jobsApproved
4AM Development. Rezoning approved 3-2 Aug 18, 2026. Special use permit not yet filed. Residents sued Sept 17.
Sep 2026
Statesboro council minutes, Aug 18, 2026
Statesboro Brief, Aug 17, 2026
Statesboro Brief, Sept 28, 2026
Oct 2, 2026
Hyundai suppliers on US 301 South
Bruce Yawn Commerce Park, Gateway park and nearby sites
Ajin/Joon Georgia $317M, 630 jobs; Ecoplastic $205M, 456 jobs; Hanon Systems $40M, 160 jobsStarted
Ajin/Joon and Ecoplastic are operating; hired as of Aug 2026: Ajin/Joon 430, Ecoplastic 268. Hanon lists its Statesboro facility among its production sites; current employment is not published. Ecoplastic land request for worker housing tabled June 2026.
Aug 2026
The Current, Sept 6, 2026
Statesboro Herald, June 2026
Hanon Systems, company network
Gov. Kemp: Hanon, May 23, 2023
Oct 2, 2026
Gateway Regional Industrial Park Phase II
Off US 301 S, Statesboro
69-acre Cannady site; $1.52 million state grant to make it pad-readyApproved
OneGeorgia grant awarded June 2025; listing location checked October 27, 2026. Pad-ready work completion unverified.
Jun 2025
Expansion Solutions, June 2025
Oct 2, 2026
revalyu recycling plant
Gateway Regional Industrial Park, Statesboro
43 acres; $200 million+; 121 jobs in two phasesStarted
Groundbreaking Oct 2023; phase one was due Q3 2025. Current operating status not confirmed.
Oct 2023
Statesboro Herald, Oct 6, 2023
EPD facility address
Oct 27, 2026 (location; stage remains unconfirmed)
American Aero
16274 US 80 E, Brooklet
45,000 SF; from 100+ to about 300 employeesStarted
Groundbreaking March 24, 2026; completion expected end of 2026
Mar 2026
Grice Connect, March 2026
Oct 2, 2026
Metter-Candler I-16 Industrial Park
Lytell St, Metter
130+ acres; DAS Corp. (300 jobs) and Doowon Climate Control ($30M+, 200 jobs) announcedApproved
$103,500 state grant (Jan 2026) to renew certification and expand the park. DAS and Doowon were announced in 2023 and 2024; current operations and hiring not confirmed.
Jan 2026
The Georgia Virtue, Jan 31, 2026
Georgia DED: DAS, Sept 2023
Gov. Kemp: Doowon, Feb 6, 2024
Oct 2, 2026
Southeast Bulloch High School
Brooklet-Denmark Rd
Up to $165 million; $50.3 million in bonds soldApproved
Bonds sold Feb 2026; construction planned from summer 2026; opening about 2029-30. Start not confirmed.
Feb 2026
WSAV, 2026
Statesboro Brief, Feb 16, 2026
Oct 2, 2026
Southeast corridor roads
Burkhalter, Harville and Cawana roads, Statesboro
Planned: two roundabout projects ($3.3 million; $2.75 million) and Burkhalter widening ($2.8 million); $193,500 corridor studyApproved
City-county cost-sharing agreement Feb 2026; county study contract Sept 1, 2026. The city counts about 1,342 units planned in the corridor.
Sep 2026
Statesboro Brief, Feb 23, 2026
Statesboro Herald, June 2025 (units and road costs)
Statesboro Brief, Aug 31, 2026
Oct 2, 2026

How we drew this market

Statesboro and Metter sit 25 miles apart on I-16. They share a labor pool and the same pull from the east, so we treat them as one market. We cut it into eight areas by what each is mostly adding: two interchanges where the jobs land, a planned new center on Old Register Road, downtown and the campus, two growth edges, a retail corridor, and downtown Metter as a satellite town. The rules are the same in every market we cover.

Two drivers sit outside the market. Hyundai's Metaplant in Bryan County had hired 4,365 of its promised 8,500 workers by June 2026.46 OpenAI's Project Camellia in Effingham County, a $20 billion data center campus, adds a second pull.62 Neither is on the ledger. Both shape it.

Coverage this month

Statesboro City Council minutes were read for December 2025 through August 2026, plus the September 1 and September 15 agendas. The city's online index does not list earlier 2025 council records, so council outcomes from April to November 2025 come from planning commission packets and press. Statesboro planning commission agendas, packets, and minutes were read for May 2025 through October 2026, except where a month's files did not load. Bulloch County Commission actions come from press and published meeting rundowns; its agendas were not read directly. Brooklet is covered through press only. Metter's February 2026 council minutes and its public notices were read; Candler County Commission was not. Georgia's regional-impact filing system could not be reached this month. If you see something we missed or got wrong, tell us and we will correct it in the next issue.

How we count: the pipeline includes filed, approved, and started projects in Bulloch and Candler counties. Plan figures count at their approved maximum. Project figures without a number here come from the list below, where each row carries its source. Bulloch and Candler counts come from Census estimates.

  1. U.S. Census Bureau, QuickFacts: Bulloch County and Candler County, Georgia (population and housing units, July 1, 2025; building permits, 2025; employment, 2023). Primary. Link · Checked October 2, 2026.
  2. City of Statesboro, Planning Commission Agenda and Packet, August 5, 2025. Primary. Link · Checked October 2, 2026.
  3. Grice Connect, Statesboro City Council approves property tax relief referendum, annexations, and housing programs , August 2025. Press. Link · Checked October 2, 2026.
  4. Grice Connect, county commission coverage, June, August, and September 2025. Press. June · August · September · Checked October 2, 2026.
  5. Statesboro Herald, Commissioners extend both moratoriums, step toward outright ban on data centers , May 2026. Press. Link · Checked October 2, 2026.
  6. Statesboro Herald, City looks toward upgrades of Burkhalter and Cawana roads and their intersections , June 2025; and The Statesboro Brief, February 23, 2026 (city-county cost sharing). Press. Herald · Brief · Checked October 2, 2026.
  7. Grice Connect, Brooklet annexes 278 acres to be used for single-family developments , July 18, 2024. Press. Link · Checked October 2, 2026.
  8. The Current, Hyundai suppliers make hiring progress in exchange for public incentives , September 6, 2026. Press. Link · Checked October 2, 2026.
  9. Expansion Solutions, Bulloch County secures $1.5M state grant for industrial site development , June 2025. Press. Link · Checked October 2, 2026.
  10. WTOC, Taxpayer dollars impacted after Aspen Aerogels abandons Bulloch County , April 2, 2025. Press. Link · Checked October 2, 2026.
  11. Georgia Department of Economic Development, DAS Corp. to bring 300 automotive jobs to Metter , September 2023. Primary. Link · Checked October 2, 2026.
  12. Office of the Governor, Second automotive supplier creating 200 new jobs in Candler County , February 6, 2024. Primary. Link · Checked October 2, 2026.
  13. The Georgia Virtue, Candler County Industrial Authority to receive state funds to expand industrial park , January 31, 2026. Press. Link · Checked October 2, 2026.
  14. City of Metter, Public hearing notice: annexation and rezoning of 46.76 acres on Fortner Road , August 12, 2026. Primary. Link · Checked October 2, 2026.
  15. City of Statesboro, City Council Minutes, August 18, 2026. Primary. Link · Checked October 2, 2026.
  16. The Statesboro Brief, editions of August 17 and September 28, 2026 (fiscal study; lawsuit). Press. Aug 17 · Sept 28 · Checked October 2, 2026.
  17. The Statesboro Brief, The data center ban died on one vote, and 21 of our neighbors get the next word , September 7, 2026. Press. Link · Checked October 2, 2026.
  18. Economic Impact Group, LOCI fiscal impact analysis: 100MW data center in Candler County , February 2026, posted by the City of Metter. Primary. Link · Checked October 2, 2026.
  19. The Statesboro Brief, Brooklet wildfire hits 389 acres, data center ban heads to Aug. 4 vote , July 27, 2026. Press. Link · Checked October 2, 2026.
  20. WTOC, Kroger breaks ground on $45.7 million Marketplace in Statesboro , August 6, 2026. Press. Link · Checked October 2, 2026.
  21. The Statesboro Brief, Edition 19 , February 16, 2026. Press. Link · Checked October 2, 2026.
  22. Statesboro Herald, Council approves Herman Rushing Rd. annexation for 198 townhome units , May 2025; and City of Statesboro, City Council minutes, April 21, 2026 (East Olliff Street). Press; Primary. Herald · Council, April 21, 2026 · Checked October 2, 2026.
  23. Hanon Systems, Global network , checked October 2026; Office of the Governor, May 23, 2023. Primary. Hanon · Governor · Checked October 2, 2026.
  24. Statesboro Herald, Recycling company revalyu breaks ground on Bulloch factory , October 6, 2023. Press. Link · Checked October 2, 2026.
  25. City of Metter, public notice, August 21, 2026. Primary. Link · Checked October 2, 2026.
  26. City of Statesboro, City Council Minutes, August 18, 2026. Primary. Link · Checked October 2, 2026.
  27. City of Statesboro, City Council Agenda, September 15, 2026. Primary. Link · Checked October 2, 2026.
  28. The Statesboro Brief, Ten neighbors spoke, and the council kept your tax rate where it was , September 21, 2026. Press. Link · Checked October 2, 2026.
  29. The Statesboro Brief, The gas tax comes off Tuesday, and the data center developers say they're moving ahead , September 28, 2026. Press. Link · Checked October 2, 2026.
  30. The Statesboro Brief, The data center ban died on one vote, and 21 of our neighbors get the next word , September 7, 2026. Press. Link · Checked October 2, 2026.
  31. The Statesboro Brief, The county decides on data centers Tuesday, and your insurance rating just improved , August 31, 2026. Press. Link · Checked October 2, 2026.
  32. City of Metter, Public hearing notice: annexation and rezoning of 46.76 acres on Fortner Road , August 12, 2026, via the Metter-Candler Advertiser. Primary. Link · Checked October 2, 2026.
  33. City of Metter, Public hearing notice: zoning for 990 Fortner Road , 2026, via the Metter-Candler Advertiser. Primary. Link · Checked October 2, 2026.
  34. City of Metter, Project Back in Black fiscal impact , September 22, 2026. Primary. Link · Checked October 2, 2026.
  35. Economic Impact Group, LOCI fiscal impact analysis: 100MW data center in Candler County , February 2026, posted by the City of Metter. Primary. Link · Checked October 2, 2026.
  36. City of Metter, Data Center Task Force , September 15, 2026. Primary. Link · Checked October 2, 2026.
  37. City of Statesboro, Planning Commission Agenda and Packet, August 5, 2025. Primary. Link · Checked October 2, 2026.
  38. Grice Connect, Statesboro City Council approves property tax relief referendum, annexations, and housing programs , August 2025. Press. Link · Checked October 2, 2026.
  39. Statesboro Herald, Council approves Herman Rushing Rd. annexation for 198 townhome units , May 2025. Press. Link · Checked October 2, 2026.
  40. Grice Connect, Commissioners approve contested subdivision, legal contract, and jail bonds , August 2025. Press. Link · Checked October 2, 2026.
  41. City of Statesboro, City Council Minutes, June 16, 2026. Primary. Link · Checked October 2, 2026.
  42. City of Statesboro, City Council Minutes, December 2, 2025. Primary. Link · Checked October 2, 2026.
  43. WTOC, Kroger breaks ground on $45.7 million Marketplace in Statesboro , August 6, 2026. Press. Link · Checked October 2, 2026.
  44. City of Statesboro, City Council Minutes, May 19, 2026. Primary. Link · Checked October 2, 2026.
  45. The Statesboro Brief, Edition 19: moratoriums, fire funding and record growth , February 16, 2026. Press. Link · Checked October 2, 2026.
  46. The Current, Hyundai suppliers make hiring progress in exchange for public incentives , September 6, 2026. Press. Link · Checked October 2, 2026.
  47. Statesboro Herald, Proposed Ecoplastic land purchase could bring worker housing development to Bulloch County , June 2026. Press. Link · Checked October 2, 2026.
  48. Expansion Solutions, Bulloch County secures $1.5M state grant for industrial site development , June 2025. Press. Link · Checked October 2, 2026.
  49. Grice Connect, American Aero breaks ground on new 45,000-square-foot facility in Brooklet , March 2026. Press. Link · Checked October 2, 2026.
  50. The Georgia Virtue, Candler County Industrial Authority to receive state funds to expand industrial park , January 31, 2026. Press. Link · Checked October 2, 2026.
  51. Georgia Department of Economic Development, DAS Corp. to bring 300 automotive jobs to Metter , September 2023. Primary. Link · Checked October 2, 2026.
  52. Office of the Governor, Second automotive supplier creating 200 new jobs in Candler County , February 6, 2024. Primary. Link · Checked October 2, 2026.
  53. WSAV, Plans for new Southeast Bulloch High School moving forward , 2026. Press. Link · Checked October 2, 2026.
  54. The Statesboro Brief, Edition 20: moratoriums pass, grocery shake-up , February 23, 2026. Press. Link · Checked October 2, 2026.
  55. Statesboro Herald, Commissioners extend both moratoriums, step toward outright ban on data centers , May 2026. Press. Link · Checked October 2, 2026.
  56. City of Statesboro, City Council Minutes, June 2, 2026 (Ordinance 2026-01, technological facilities and data centers). Primary. Link · Checked October 2, 2026.
  57. U.S. Census Bureau, QuickFacts: Bulloch County and Candler County, Georgia (population and housing units, July 1, 2025; building permits, 2025). Primary. Link · Checked October 2, 2026.
  58. The Statesboro Brief, The mayor broke the tie, and the Burkhalter rezoning passed , August 24, 2026. Press. Link · Checked October 2, 2026.
  59. The Statesboro Brief, A $1.2 billion number, 12 jobs, and Tuesday's data center vote , August 17, 2026. Press. Link · Checked October 2, 2026.
  60. City of Statesboro, City Council Agenda, September 17, 2024 (AN 24-07-01, V 24-07-02, RZ 24-07-03). Primary. Link · Checked October 2, 2026.
  61. The Statesboro Brief, Edition 32: new GSU hotel project , May 18, 2026. Press. Link · Checked October 2, 2026.
  62. The Statesboro Brief, Brooklet wildfire hits 389 acres, data center ban heads to Aug. 4 vote , July 27, 2026 (Project Camellia, Effingham County). Press. Link · Checked October 2, 2026.
  63. City of Metter, Regular Meeting Minutes, February 9, 2026. Primary. Link · Checked October 2, 2026.
  64. WTOC, Taxpayer dollars impacted after Aspen Aerogels abandons Bulloch County , April 2, 2025. Press. Link · Checked October 2, 2026.
  65. Grice Connect, Bulloch County commissioners reject subdivision plans, raise concerns over water and fire protection , September 2025. Press. Link · Checked October 2, 2026.
  66. Grice Connect, Chairman Bennett breaks tie vote to deny 59-lot residential subdivision , June 2025. Press. Link · Checked October 2, 2026.
  67. City of Statesboro, Planning Commission Agenda and Packet, May 6, 2025. Primary. Link · Checked October 2, 2026.
  68. City of Statesboro, Planning Commission Agenda and Packet, September 1, 2026. Primary. Link · Checked October 2, 2026.
  69. Hanon Systems, Global network (Hanon Systems Statesboro, 8540 Zell Miller Parkway), checked October 2026; and Office of the Governor, Automotive supplier Hanon Systems to create 160 new jobs in Bulloch County , May 23, 2023. Primary. Hanon · Governor · Checked October 2, 2026.
  70. Statesboro Herald, Recycling company revalyu breaks ground on Bulloch factory , October 6, 2023. Press. Link · Checked October 2, 2026.
  71. Statesboro Herald, City looks toward upgrades of Burkhalter and Cawana roads and their intersections , June 2025. Press. Link · Checked October 2, 2026.
  72. City of Metter, Public notice on data center inquiries and airport-area annexation , August 21, 2026, via the Metter-Candler Advertiser. Primary. Link · Checked October 2, 2026.

Original project records retain their verification dates. Park and land discovery sources checked October 27, 2026; dated source claims and unresolved questions are stated above.